Abstract
Transportation of patients is a key hospital operational activity. During a large construction project, our patient admission and prep area will relocate from immediately adjacent to the operating room suite to another floor of a different building. Transportation will require extra distance and elevator trips to deliver patients and recycle transporters (specifically: personnel who transport patients). Management intuition suggested that starting all 52 first cases simultaneously would require many of the 18 available elevators. To test this, we developed a data-driven simulation tool to allow decision makers to simultaneously address planning and evaluation questions about patient transportation. We coded a stochastic simulation tool for a generalized model treating all factors contributing to the process as JAVA objects. The model includes elevator steps, explicitly accounting for transporter speed and distance to be covered. We used the model for sensitivity analyses of the number of dedicated elevators, dedicated transporters, transporter speed and the planned process start time on lateness of OR starts and the number of cases with serious delays (i. e., more than 15 min). Allocating two of the 18 elevators and 7 transporters reduced lateness and the number of cases with serious delays. Additional elevators and/or transporters yielded little additional benefit. If the admission process produced ready-for-transport patients 20 min earlier, almost all delays would be eliminated. Modeling results contradicted clinical managers' intuition that starting all first cases on time requires many dedicated elevators. This is explained by the principle of decreasing marginal returns for increasing capacity when there are other limiting constraints in the system.
Original language | English |
---|---|
Pages (from-to) | 155-169 |
Number of pages | 15 |
Journal | Health Care Management Science |
Volume | 15 |
Issue number | 2 |
DOIs | |
State | Published - Jun 2012 |
Bibliographical note
Funding Information:Financial Support The work of the second author is supported in part by National Science Foundation grants DMS-0732175 and CMMI-0846554 (CAREER Award), an Air Force Office of Scientific Research (AFOSR) award FA9550-08-1-0369, a Singapore-MIT Alliance (SMA) grant and the Buschbaum Research Fund of Massachusetts Institute of Technology.
Keywords
- Elevators
- First case on time starts
- Hospital transportation
- Logistics
- Operating room
- Perioperative systems design
ASJC Scopus subject areas
- Medicine (miscellaneous)
- General Health Professions