Abstract
Consider a production system with m unreliable machines, which are maintained by a single repairman. The time until failure of machine i and its repair time are exponentially distributed random variables with rates λi and μ, respectively. Machine i earns at rate ri while it is working. The service rate can be controlled, and a cost c(μ) is charged when the service rate is μ. We assume the following compatibility condition: λi < λj implies that ri ≥ rj. We consider both the optimal assignment of the repairman to the failed machines, and the optimal service rate. We demonstrate some monotone properties of the optimal policy.
| Original language | English |
|---|---|
| Pages (from-to) | 274-280 |
| Number of pages | 7 |
| Journal | European Journal of Operational Research |
| Volume | 116 |
| Issue number | 2 |
| DOIs | |
| State | Published - 16 Jul 1999 |
ASJC Scopus subject areas
- General Computer Science
- Modeling and Simulation
- Management Science and Operations Research
- Information Systems and Management
Fingerprint
Dive into the research topics of 'Jointly optimal allocation of a repairman and optimal control of service rate for machine repairman problem'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver